SCRIPT CONTENT
Make sure all connections are secure to prevent leakage.
Ensure that water may drip freely from the pressure relief valve.
If the mixing apparatus is installed, set the temperature with the temp regulator.
Make sure the valve on the pressure safety conduit is open.
After all connections have been checked for water tightness, you may begin to fill the container.